
This training module, which has been independently accredited by the CPD body provides a 1 hour course to contribute towards continuous professional development. In this module we will explore ways to improve understanding of how correct installation plays an important part in increasing asset durability and reducing whole life costs
As traffic speed and intensity increases the solutions and methods used to install and maintain street ironwork need to evolve in order to provide a resilient and reliable network. This module will also consider the emergence of industry requirements, guidance and standards that aid in material...
As traffic speed and intensity increases the solutions and methods used to install and maintain street ironwork need to evolve in order to provide a resilient and reliable network. This module will also consider the emergence of industry requirements, guidance and standards that aid in material and system selection. The outcomes of the Nottingham University Research to study the behavior of road ironwork installations has helped determine the mechanisms of failure and the development of a systemised approach to installation practices by identifying
A casting design which interacts with the bedding and surround to reduce the risk of cracking.
The selection of the materials with the correct performance characteristics
The creation of specifications to define installation procedures
The course includes a 45 minute presentation followed by a 15 minute question and answer session
Provider
Saint-Gobain PAM UK
Category
Asset Management
Drainage
Network Maintenance
Network Management
Streetworks Inspections & Permitting
Format
In-person
Accreditation
1 CPD hours
Cost
Free of charge